Turbosmart BOOST CONTROLLERS – ELECTRONIC - e-Boost2 (2005-cu Manuel d'utilisateur Page 25

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 38
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 24
www.TURBOSMARTONLINE.com
25
SSE (Sequential switching function E): Timed sequential switching function E allows the set-points to be mapped and switched
during a predetermined time interval.
dS1-6 is the amount of time you wish each boost group to be active for, up to a maximum of 99 seconds. dS can be entered
in 0.1s increments – 6 seconds = 060
Only the first 4 seconds of each boost group can be mapped and the last set point value that is mapped will continue to be
active for remainder of the time delay (if set longer than 4 seconds).
The first 4 seconds can be mapped in 0.2 second intervals which means you can have up to 20 mapped set point values
within the first 4 seconds of the boost group.
Entering a value in the SP parameter of the boost group will paste this value through all time increments.
Gate pressure is not available with this function and will no longer be visible in the boost group.
dS1 will refer to the amount of time BG1 is active before switching to BG2, dS2 to the amount of time BG2 is active before
switching to BG3 and so on.
This is a solely time based switching method and will not be dependant on switching except for a reset to SP1 (earthing the
orange wire) and a GO (earthing the green wire) which will start the timer.
Example 1: dS1=4s with 4s map defined
0
10
20
30
40
50
60
0
2
4
6
8
10
12
dS1 = 4s
(20 Points)
BG1 Map
Orange – Reset
Green – Start
Timer
0
10
20
30
40
50
60
0
2
4
6
8
10
12
dS1 = 4s
(20 Points)
Orange – Reset
Green – Start
Timer
BG1 Map
dS2 = 4s
(20 Points)
BG2 Map
Example 2: dS1=4s, dS2=4s with 8s map defined
Example 3: dS1-6=4s – Maximum 24s of full mapping
Set point
Set point
Vue de la page 24
1 2 ... 20 21 22 23 24 25 26 27 28 29 30 ... 37 38

Commentaires sur ces manuels

Pas de commentaire